Our quality and priorities are still the same.

ARGÜP MÜHENDİSLİK

Technical Precision in Critical Infrastructure

For over 40 years we have built quality, reliable and technically excellent structures for government institutions and the defense industry.

About Us

OUR MISSION AND
VISION

Argüp Mühendislik has been operating since 1986 as one of Turkey’s most established and reliable engineering firms. We provide services across a wide range, from the defense industry to public buildings, from infrastructure projects to historic restoration works.

The letters of commendation given to us by government institutions and our leadership in our sector are concrete proof of our quality and our commitment to customer satisfaction. Today we still show the same diligence and care on every project, guided by the values we were founded on.

0 YEARS OF EXPERIENCE
0 Completed Projects
0 ACTIVE PROJECTS
0 Expert Staff
Argüp Mühendislik site team

In complex engineering projects that push architectural and technical boundaries, over 40 years of experience, we build reliable, high-technology solutions for government institutions and our international business partners.

0

FROM THE PAST TO TODAY

OUR HISTORY

1987

WE BROKE GROUND

COMPANY ESTABLISHMENT YEAR

2001

REPAIR OF THE CONFERENCE ROOMS, BRIEFING HALLS, AND OPERATIONS CENTER OF THE 4TH CORPS COMMAND, TURKISH LAND FORCES COMMAND

ANKARA

2002

REPAIR OF THE AMENITIES FACILITIES OF THE 2ND COMMANDO BRIGADE, 4TH CORPS COMMAND.

BOLU

2003

INFRASTRUCTURE CONSTRUCTION FOR THE 30-UNIT AIT FACILITY AT BODRUM-MILAS AIRFIELD COMMAND.

MİLAS / MUĞLA

2004

CONSTRUCTION OF THE HAİT FACILITY AT İZMİR GARRISON

İZMİR

2004

CONSTRUCTION OF 224 RESIDENTIAL UNITS, INTERNAL BLOCK INFRASTRUCTURE, LANDSCAPING, AND GENERAL INFRASTRUCTURE IN AĞRI.

AĞRI

2004

SİNCAN PRISON COMPLEX: OPEN PRISON, WOMEN’S PRISON, SHARED FACILITIES AND INFRASTRUCTURE

SİNCAN / ANKARA

2005

REPAIR AND SEISMIC RETROFITTING WORKS AT İZMİR ÖZDERE NAİM TALU TRAINING AND RECREATION FACILITY

MENDERES / İZMİR

2006

CONSTRUCTION OF THE ISTANBUL ANATOLIAN SIDE COURTHOUSE.

KARTAL / İSTANBUL

2010

CONSTRUCTION OF THE TRACKED VEHICLE WORKSHOP AND RENOVATION OF WORKSHOP FACILITIES AT THE 7TH MAINTENANCE CENTER COMMAND

TUZLA / İSTANBUL

2011

INFRASTRUCTURE WORKS FOR THE 100-BED STATE HOSPITAL IN TAVŞANLI, KÜTAHYA

TAVŞANLI/ KÜTAHYA

2012

CONSTRUCTION OF THE SERVICE BUILDING FOR THE MINISTRY OF NATIONAL DEFENSE (MSB) ANT DIRECTORATE.

ANKARA

2012

SEA OF MARMARA NATURAL GAS PIPELINE MAINTENANCE AND REPAIR

SEA OF MARMARA

2013

COMPLETION OF THE PHYSICAL TRAINING AND WATER TRAINING FACILITIES AT THE OĞULBEY COMPLEX OF THE SPECIAL FORCES COMMAND.

ANKARA

2014

EMERGENCY PHYSICAL SECURITY SYSTEM FOR THE BORDER LINE

KİLİS, ŞANLIURFA, MARDİN

2014

GENERAL REPAIR WORKS AT THE PRESIDENTIAL GUARD REGIMENT

ANKARA

2014

CONSTRUCTION OF INFRASTRUCTURE AND BUILDINGS REQUIRED FOR SF-260 AIRCRAFT AT YALOVA AIRFIELD COMMAND

YALOVA

2016

MKE – CONSTRUCTION OF 564 RESIDENTIAL UNITS AND SOCIAL FACILITIES FOR KIRIKKALE MUNICIPALITY

KIRIKKALE

2016

COMPLETION OF THE HOSPITAL CONSTRUCTION AT MARMARA UNIVERSITY’S MALTEPE CAMPUS

İSTANBUL

2017

KÜTAHYA PROVINCIAL POLICE DEPARTMENT SERVICE BUILDING

KÜTAHYA

2017

CONSTRUCTION OF RETAINING WALLS, GABION WALLS, AND A TERRAMESH SYSTEM FOR TOKİ IN KÜRE, KASTAMONU.

KÜRE KASTAMONU

2017

COMPLETION WORKS FOR THE CONSTRUCTION OF THE CONFERENCE HALL AND POLICE MUSEUM AT THE EGM DIKMEN ADDITIONAL SERVICE BUILDING.

ANKARA

2018

CONSTRUCTION OF THE GRANDSTAND AT THE BALIKESİR LAND FORCES NON-COMMISSIONED OFFICER VOCATIONAL SCHOOL.

BALIKESİR

2018

COMPLETION OF THE CONSTRUCTION OF THREE 120-PERSON BORDER OUTPOSTS IN YÜKSEKOVA, HAKKÂRİ, INCLUDING INFRASTRUCTURE AND LANDSCAPING WORKS.

HAKKARİ/ YÜKSEKOVA (CENGİZ, YILDIZ VE ÖZGEN MEVKİLERİ)

2018

CONSTRUCTION OF A DRINKING WATER SUPPLY SYSTEM AND WATER TREATMENT PLANT IN HOPA, ARTVİN.

HOPA / ARTVİN

2018

DOOR, WALL, AND ROOF REPAIR WORKS AT THE HANGAR BUILDINGS OF İZMİT NAVAL AIR COMMAND.

İZMİT / KOCAELİ

2022

CONSTRUCTION OF UNPAVED ROADS AT VARIOUS LOCATIONS WITHIN THE AREA OF RESPONSIBILITY OF THE 2ND ARMY COMMAND (PHASE 1)

ÇUKURCA / HAKKARİ

2022

CONSTRUCTION OF THE 2ND LINE PHYSICAL BARRIER SYSTEM (PHASE 1) UNDER ASFGS FOR THE 2ND BORDER REGIMENT COMMAND, AND COMPLETION OF PHASE 3 SUPPLEMENTARY WORKS IN HATAY PROVINCE.

HATAY (Halepli, İlker Acar, Güntepe, Karakaya, Hüseyin Koroç, Oğulpınar ve Cilvegözü Hudut Karakolları Bölgesi)

2023

CONSTRUCTION OF A NEW AUTOMATIC TRANSMISSION AND BRAKE TEST WORKSHOP FOR THE 6TH MAIN MAINTENANCE FACTORY DIRECTORATE.

BALIKESİR

2023

AKSAZ NAVAL BASE COMMAND VARIOUS RESTORATION WORKS

MUĞLA

2023

MODERN HUNTING LODGE

GÖLBAŞI / ANKARA

2024

CONSTRUCTION OF A REINFORCED CONCRETE RETAINING WALL IN THE EXPANSION AREA OF ASO 2ND AND 3RD ORGANIZED INDUSTRIAL ZONES

ANKARA

2024

ARGÜP NATURE HOMES

KUŞADASI / AYDIN

2025

CUSTOM-BUILT DETACHED VILLA

GÖLBAŞI / ANKARA

Service that pushes architectural and technical boundaries

Advanced Engineering That Shapes Complex Structures